How to Choose an OMS, WMS or ERP in 6 Weeks: Scripts and Scorecard

A 6-week software selection: 15–25 real-order scenarios, one demo script for every vendor, a weighted 1–5 rubric and references you find yourself.

Updated 2026-11-26 · For T2, T3, T4 · OMS, WMS, ERP, IMS, iPaaS, Planning, PIM

Short answer: write 15–25 must-have scenarios from your real orders, make every vendor demo the same script using your data, score each scenario live against a weighted rubric, and call references the vendor didn’t pick. Six weeks is enough for a T2–T3 brand choosing an OMS, WMS, IMS or a mid-market ERP if one person owns the process and the team blocks the time.

The point of the process is to change who controls the story. A vendor’s standard demo runs on staged data and shows the paths that work. A scripted demo on your ugliest wholesale order, your split shipment and your return shows the paths you’ll actually live with. Most founders pick from one demo and one referral, and most selection consultants sell a much longer process. This sits in between.

Who sells software selection advice, and what’s their conflict?

Consultants bill for long processes, vendors prefer unscripted demos, and partners often bid on the implementation they help select.

  • Selection consultants (Panorama and others) recommend formal, multi-month processes and bill for running them. Panorama’s own data is often quoted to justify this: in its 2024 report, a third (33.3%) of significantly over-budget projects had used technology assessment services (Panorama 2024). Without knowing how many projects overall used assessments, that figure doesn’t prove assessments prevent overruns. Panorama sells assessments.
  • Vendors prefer unscripted demos, because they control what you see.
  • Implementation partners often help with selection while also bidding on the implementation, and many resell licenses. That’s a conflict even when they’re good at it.

You can hire help. Just prefer someone who isn’t also bidding on the work, and ask in writing what they earn from each vendor on the list.

Week 1: How do you write requirements from real orders?

Write 15–25 scenarios from real transactions instead of a feature spreadsheet. Skip the 400-line feature spreadsheet. Vendors answer “yes” to nearly everything on those. Instead, pull real transactions and write scenarios: a short story of something that must work, with the data to prove it.

Aim for 15–25 scenarios. Good ones for a commerce brand:

  1. A DTC order with three lines, one backordered: split, partial ship, customer notified.
  2. Your largest wholesale order last quarter, with retailer routing and labeling rules and an EDI 850 in and 856 out.
  3. A bundle or kit sold on Shopify, with inventory decremented by component.
  4. An Amazon order and a Shopify order competing for the last unit.
  5. A return with an exchange to a different size, and the refund posted to the books.
  6. A purchase order received short, with the rest backordered and landed cost applied.
  7. An inventory transfer between two warehouses or a warehouse and a 3PL.
  8. Month-end: inventory valuation report that ties to the general ledger.
  9. A price list for one wholesale customer, with a credit limit hold.
  10. A peak-day volume test: what happens at three times your normal daily orders.

Mark each scenario must-have or nice-to-have, and mark any must-have that is a deal-breaker if it fails.

Week 2: How do you cut the long list to 3 or 4 vendors?

Filter by your segment, cut on deal-breakers and budget, and ask for pricing before any demo.

  • Start from category guides (OMS, WMS, ERP, inventory) and filter by your segment: operator type, orders per day, channel mix.
  • Cut to three or four vendors using deal-breakers and budget. More than four, and nobody on your team will remember the first demo by the last.
  • Ask for pricing before demos. Use your volumes, user counts and integrations, and ask for the renewal cap, overage rates and implementation estimate. Vendors that publish pricing, such as ShipHero (pricing page), make this easy; for quote-only vendors, a written budgetary range is a fair ask. A vendor who won’t give a range before the demo is telling you something.

Luminous, which sells order, inventory, B2B and light manufacturing software, would be on some of these shortlists. The category rankings put it at or near the top in several categories, but on thin independent evidence: about seven reviews in the last two years, and the two newest are negative (G2, Capterra). Check its job-fit scores and confidence label before you shortlist it.

Weeks 3–4: How do you run a scripted software demo?

Send the script and a data file (a few hundred real SKUs, orders and customers, anonymized as needed) at least a week before each demo. Rules:

  • Same script, same order, every vendor. The vendor can add ten minutes of their own at the end.
  • Live, not slides. “That’s on the roadmap” and “our partner handles that” score as not met. Integrations shown on a slide score as not met.
  • Your scorers score live, each on their own sheet, before discussing.
  • Record the session if the vendor agrees, to settle disputes later.
  • Ask for a sandbox with your data loaded afterward, and try the deal-breaker scenarios yourself. Some vendors offer trials openly: Microsoft lists a free trial for Business Central on its pricing page. Reluctance to give a sandbox is a signal.

How do you score vendors with a weighted rubric?

Weight what matters to your business, agree the weights before the first demo, and score 1–5.

Worked example (illustrative, our calculation):

AreaWeightVendor AVendor BVendor C
Order scenarios (DTC, wholesale, returns)30%435
Inventory and warehouse scenarios20%342
Integrations (Shopify, 3PL, EDI, accounting)20%353
Finance and reporting10%433
Usability for the people who’ll use it daily10%534
Commercial terms (price, cap, exit)10%342
Weighted score3.63.73.4

How each weighted score is calculated, using Vendor A: 0.30×4 + 0.20×3 + 0.20×3 + 0.10×4 + 0.10×5 + 0.10×3 = 1.2 + 0.6 + 0.6 + 0.4 + 0.5 + 0.3 = 3.6.

Vendor B wins narrowly on points. Now apply the deal-breaker column: if Vendor B failed scenario 2 (your largest retailer’s EDI order), it’s out regardless of score. The rubric is there to make the trade-offs explicit, not to make the decision for you. A 0.1-point gap is a tie. Break ties on references and contract terms.

Week 5: How do you find references the vendor didn’t pick?

Vendor-supplied references are hand-picked happy customers. Use them, but also find two per finalist yourself:

  • Search review sites and LinkedIn for people at companies like yours whose job history lists the product.
  • Ask in operator communities for people who left the product, and why.
  • Ask your 3PL, EDI provider or integration partner which customers run the system and how it behaves.

Questions that get past politeness: What took longer than promised? What did you have to buy that you didn’t expect? What happened at your last peak? What did your renewal do? Would you buy it again at today’s price?

Week 6: How do you make the final decision?

Put the rubric, deal-breakers, references and three-year cost on one page.

  • Get final pricing from your top two on the same assumptions, modeled over three years. See what NetSuite actually costs for the line items that get left out.
  • Send your clause list early. Use the SaaS contract clause checklist.
  • Negotiate implementation separately from license where you can. Vendr claims unbundling and competing partner bids cut implementation cost 15–30% (Vendr, its own claim).
  • Decide with the rubric, the deal-breakers, the references and the three-year cost on one page.

Why do software projects go over budget and schedule?

Panorama’s 2025 ERP Report names “data issues” as the top cause of schedule overruns and the “unexpected need for additional technology” as the top cause of budget overruns (Panorama 2025). It also reports a median ERP project cost of $450,000 and a median timeline of 9 months, from a sample of much larger companies (median revenue $400.5M). Two lessons apply to any ops system: put data migration in your scenarios, and price every integration before you sign. See the honest ERP failure stats.

The 6-week selection in 8 steps

  1. Name one owner and block demo time on the calendars of everyone who will score.
  2. Write 15–25 scenarios from real orders this week, with deal-breakers marked.
  3. Agree rubric weights before any demo.
  4. Ask for pricing and a renewal cap before demos.
  5. Send the same script and data to every vendor, and score live.
  6. Find two references per finalist yourself.
  7. Ask every advisor and partner what they earn from each vendor. Get it in writing.
  8. Decide on one page: scores, deal-breakers, references, three-year cost and contract terms.

RFP and demo scorecard template (coming soon)

An RFP and demo scorecard. Inputs: your scenario list with must-have and deal-breaker flags, area weights, and 1–5 scores per scorer per vendor. Outputs: averaged and weighted totals per vendor, a deal-breaker column that flags any failed must-have, and a one-page decision summary with three-year cost alongside.

Sources

  1. Panorama Consulting Group: 2024 ERP Report (sells selection consulting) · 4439340.fs1.hubspotusercontent-na1.net · accessed 2026-11-26
  2. Panorama Consulting Group: 2025 ERP Report · 4439340.fs1.hubspotusercontent-na1.net · accessed 2026-11-26
  3. Microsoft Dynamics 365 Business Central pricing (free trial) · microsoft.com · accessed 2026-11-26
  4. Vendr: NetSuite pricing guide (updated 2026-02) · vendr.com · accessed 2026-11-26
  5. ShipHero WMS pricing · shiphero.com · accessed 2026-11-26
  6. G2: Luminous reviews (newest 2026-02, 2.5/5) · g2.com · accessed 2026-11-26
  7. Capterra: Luminous reviews (newest 2026-08, 1/5) · capterra.com · accessed 2026-11-26